PROJECT

Projects

Environmental & Social Review Summary

Project Number

27274

Company Name

E-Power SA

Date ESRS Disclosed

Jan 23, 2009

Country

Haiti

Region

Latin America and the Caribbean

Last Updated Date

Apr 7, 2023

Environmental Category

B - Limited

Status

Completed

Previous Events

Approved : Dec 19, 2010
Signed : Jul 1, 2009
Invested : Dec 15, 2009

Sector

Heavy Fuel Oil - Thermal Power Generation

Industry

Infrastructure

Department

Gbl Infrastructure & Natural Resources

Project Description

The proposed E-Power Thermal Power Plant (“the Project”) involves the construction, operation, maintenance and decommissioning of a 31.2 MW diesel power plant using heavy fuel oil (“HFO”) on a build-own-and-operate (“BOO”) basis in PAP. The project will be constructed in Drouillard, Cité Soleil, on a 50,000 m2 site located in the Hispaniola Investment Company (HINSA) free zone, west of the PAP International Airport. The facility will consist of 8 (eight) Hyundai HIMSEN H32/40 generating sets, operating at 720 rpm, on Bunker C#6, four heavy fuel treatment units, one heat recovery steam generator (HRSG), one steam turbine set, a cooling tower, and associated auxiliary facilities. Each thermal power plant will consist of a 9-cylinder turbo-charged, highly efficient HIMSEN engine. Each engine will have its own generator. The units will be fired using #2 distillate fuel oil but will run on #6 Heavy Fuel Oil. Additionally the project will involve a 3-km-69 kw transmission line and a 4.5-km long pipeline.

Engineering, Procurement and Construction (“EPC”) contractors will be the Korean companies Hyundai and DECCO, on a full-turnkey basis. Construction period is expected to be eighteen months. Total project costs are estimated at US$50 million to be financed on a 75:25 debt to equity basis.

Overview of IFC's Scope of Review

IFC’s appraisal of this project consisted of desk review of environmental, social, health and safety, and labor information, including the revision of the first and final draft of Environmental Impact Study (EIA) and the Environmental and Social Management Plan (ESMP) for the project, prepared by the consortium ENTRIX (Environmental and Natural Resources Management Consultants, www.entrix.com) and Paredes Consultores Ambientales, S.A. (www.pcambientales.com). Furthermore, an environmental specialist based in IFC HQ in DC performed a site visit to E-Power site in Port au Prince (PAP), and held meetings with the sponsor’s Environmental Manager, representatives from ENTRIX, and with representatives from the Haitian Environmental Ministry. During the site visit, the IFC team visited the empty lot where the power plant will be built, and held extensive discussions with the sponsors to improve the EIA process, ESMP, and assure compliance with IFC’s Performance Standards on Social and Environmental Sustainability.

E & S Project Categorization and Applicable Standard

Environmental and Social Mitigation Measures

Stakeholder Engagement

Client Documentation

File Name Actions
Annex_1_Stack Emissions_E_Power.pdf