PROJECT

Projects

Environmental & Social Review Summary

Project Number

26586

Company Name

SANCHUAN ENERGY GROUP COMPANY LIMITED

Date ESRS Disclosed

Jun 4, 2008

Country

China

Region

East Asia and the Pacific

Last Updated Date

Aug 19, 2022

Environmental Category

B - Limited

Status

Completed

Previous Events

Approved : Nov 27, 2008
Signed : May 19, 2009
Invested : Jun 11, 2009

Sector

Large Hydro - Renewable Energy Generation

Industry

Infrastructure

Department

Regional Industry - INF Asia & Pac

Project Description

The proposed project has two parts. Part I is to 1) finance five small hydropower stations with total installed capacity of 44MW and associated assets owned by Hangzhou Qiandaohu Hengxin Hydropower Development Co. Ltd. (“Qiandaohu”) in Zhejiang Province; and 2) re-finance the existing short to medium term loans of the subsidiaries of Qiandaohu. Part II is a proposed IFC equity investment in Sanchuan Energy Development Co. Ltd. (“Sanchuan” or “The holding company”) which was established in 2009 to hold all the existing hydropower assets of the sponsor as well as to invest in new hydropower stations, including seven hydro stations with total capacity of 179MW currently in the pipeline for acquisition and development. In early 2010, Sanchuan acquired an operational asset located at the Mengnong river basin, Yunnan, China with an installed capacity of 39MW.

Overview of IFC's Scope of Review

The proposed project is an investment with Zhongda Sanchuan Hydro Development Co. Ltd. (“Zhongda Hydro”, or the “Sponsor”), an existing IFC client. Part I is the financing of one new hydro plant and the refinancing of a cascade of four small hydro power stations on the Yungang River in Zhejiang Province. These are operated or under development by a subsidiary of Zhongda Hydro. Part II is an equity investment in a holding company that will be established to hold all of the Sponsor’s hydropower assets. Additional projects are under development, and project designs and social and environmental documentation and approvals are in progress. The Asian Development Bank (“ADB”) is also considering investing in parallel with IFC, and a joint appraisal mission was conducted. IFC financed another subsidiary’s three greenfield hydro plants in Yunnan Province in 2006. IFC staff visited many of the Sponsor’s existing and planned hydropower assets in 2005 and, with ADB, in 2007. IFC and ADB were assisted in their appraisal of the Yungang River power stations by technical consultant, Stucky, of Switzerland as Lenders’ Independent Engineer. Stucky earlier provided similar services to IFC on the Yunnan Province projects. Staff from IFC, ADB, and Stucky have met with the Sponsor’s corporate and plant-level staff, local officials, and affected communities, and have reviewed feasibility studies and environmental and social impact study documents for selected plants including the new Tangcun plant to be financed under Part I.

E & S Project Categorization and Applicable Standard

Environmental and Social Mitigation Measures

Stakeholder Engagement

Client Documentation

File Name Actions
ZH II 26586 ESAP 20100324.pdf