PROJECT

Projects

Environmental & Social Review Summary

Project Number

26405

Company Name

MASINLOC POWER PARTNERS CO. LTD.

Date ESRS Disclosed

Oct 9, 2007

Country

Philippines

Region

East Asia and the Pacific

Last Updated Date

Feb 19, 2017

Environmental Category

B - Limited

Status

Completed

Previous Events

Approved : Nov 8, 2007
Signed : Feb 15, 2008
Invested : Apr 14, 2008

Sector

Coal - Thermal Power Generation

Industry

Infrastructure

Department

Regional Industry - INF Asia & Pac

Project Description

Masinloc CTPP is located about 250 km northwest of Metro Manila, in the north of Luzon. The site is on a peninsula that extends into the South China Sea. It is bordered on the north and east by agricultural plantations and informal rural communities, and Oyon Bay is immediately south. The plant occupies an area of about 137 ha, including 11 ha on land reclaimed from the sea. The Masinloc plant was designed and commissioned in 1998 as a two-unit, 600 MW plant. It is anticipated that in the future MPPC will undertake an expansion of the plant subject to securing all the permits and consents and economic and environmental viability. There is currently no definite plan for expansion.

The power plant consists of two 300 MW coal-fired thermal power units, providing a total output of 600 MW. Power generated is delivered at the plant’s 230 kV switchyard connected to the transmission system of TRANSCO. The plant utilizes refined coal from Australia, China, Indonesia and occasionally local coal. Coal is received at an offshore jetty, transported onshore via a 1 km conveyor system, and stored in stockpiles with a capacity of 270,000 tons. Crushed coal from the stockpiles is transferred to coal silos, to pulverizers for final grinding, and then to the boilers. Fuel oil is used for start-up and has increasingly been used as supplemental fuel at the plant. Seawater from Oyon Bay is utilized for cooling. Fly ash is collected by electrostatic precipitators (ESP) and bottom ash is collected by the boiler’s bottom hopper, prior to transfer to an onsite ash disposal area. Fly ash has historically been sold to a third party broker for use in cement; this is expected to continue under MPPC.

Overview of IFC's Scope of Review

IFC’s proposed investment will partly finance the privatization of the 600 MW Masinloc Coal-fired Thermal Power Plant (the Masinloc CTPP or MCTPP) in the Philippines and currently owned and operated by National Power Corporation (NPC). Masinloc Power Partners Co. Ltd. (MPPC) was awarded the asset in July 2007 and is currently completing its acquisition plans. MPPC plans to rehabilitate the Masinloc CTPP to improve its operating performance such as plant’s availability and to address certain environmental issues such as excess dust emissions to ensure its environmental compliance. Currently, MPPC is a wholly-owned subsidiary of AES Corporation of the US. However, AES Corporation is expected to introduce a minority partner in the near future.

Masinloc Power Partners engaged ERM-Hong Kong, Limited to conduct a Phase I Environmental Due Diligence review of the existing operations at the plant and to develop a Remedial Action Plan for Masinloc to meet Government of the Philippines (GOP) requirements and IFC’s Performance Standards within a reasonable timetable. MPPC also engaged the Asia Pacific offices of PB Power to conduct a technical condition assessment of the plant to prepare a turnaround plan to assist in planning necessary equipment and procedural upgrades. ERM and PB Power conducted site visits and interviews at Masinloc in September 2007.


ERM and PB Power’s October 2007 reports were the primary basis for IFC’s environmental and social review of the project. IFC staff also reviewed other documents provided by MPPC and developed through IFC’s due diligence. Key items beyond those included in the company’s Remedial Action Plan will be part of an Action Plan to be agreed with IFC (attached).

E & S Project Categorization and Applicable Standard

Environmental and Social Mitigation Measures

Stakeholder Engagement

Client Documentation

File Name Actions
Masinloc_Action_Plan.pdf