PROJECT

Projects

Environmental & Social Review Summary

Project Number

25781

Company Name

Eiffel Ridge Group C.V.

Date ESRS Disclosed

Mar 12, 2007

Country

Brazil

Region

Latin America and the Caribbean

Last Updated Date

Jun 3, 2021

Environmental Category

B - Limited

Status

Completed

Previous Events

Approved : Jun 27, 2007
Signed : Jul 30, 2007
Invested : Sep 26, 2007

Sector

Oilfield Services

Industry

Metals and Mining

Department

Gbl Infrastructure & Natural Resources

Project Description

QGOG has been awarded separate contracts to build and operate two dynamically positioned semi-submersible offshore drilling rigs capable of working in water depths of up to 2,000 m and 2,400 m respectively.

QGOG, the oil and gas subsidiary of Queiroz Galvão S.A. (QG), will operate these rigs for Petrobras in Brazil. The rigs will have the latest, well established designs and equipment and are to be built separately under:

- EPC contract with Single Buoy Moorings Inc., a subsidiary of SBM Offshore N.V. at the Gulf Piping shipyard in Abu Dhabi (owned by International Management and Construction Company which is well known in the region), and
- another shipbuilding contract with Keppel at its shipyard in Singapore.

The rig designs are well established and many similar rigs are in use worldwide. The rigs are expected to be built, mobilized and placed under contracts to Petrobras. QGOG already operates two shallow water semi-submersible rigs acquired in the mid-1990s for Petrobras. It will use its existing onshore base in Macae to support rig operations.

IFC has been invited to join a group of lenders to finance this project.

Overview of IFC's Scope of Review

Queiroz Galvão Óleo e Gás S.A. (QGOG or the company) is a Brazilian company engaged in providing drilling services to Petrobras and other operators. In 2003 IFC provided corporate financial support to QGOG for its investments in developing its oil and gas business. A review of QGOG’s existing technical, environmental and social documentation submitted by the Company and the Mandated Lead Arranger was conducted for the new loan, along with the information obtained from a recent IFC supervision mission carried out in April 2006 to monitor performance under the existing loan. Additional information about management of the project was obtained by interview with QGOG’s Environmental Health and Safety (EHS) manager.

E & S Project Categorization and Applicable Standard

Environmental and Social Mitigation Measures

Stakeholder Engagement

Client Documentation

File Name Actions
QGOG Rigs 25781 Action Plan.pdf