Environmental & Social Review Summary

Project Number

24833

Company Name

Randon S.A. Implementos e Participacoes.

Date ESRS Disclosed

Mar 8, 2007

Country

Brazil

Region

Latin America and the Caribbean

Last Updated Date

Jun 3, 2021

Environmental Category

B - Limited

Status

Completed

Previous Events

Approved : Jun 19, 2007
Signed : Jun 26, 2007
Invested : Feb 1, 2008

Sector

Motor Vehicle Parts

Industry

Manufacturing

Department

Regional Industry MAS LAC & EUR

Project Description

The Randon Group (the Randon Group) is a medium-sized Brazilian industrial group and a good existing IFC client. The Randon Group is Brazil’s leading producer of trailers mainly for trucks and rail transportation, and it also manufactures automotive components, including friction materials for brakes. The Randon Group is headquartered in Caxias do Sul, a city 120 miles north of Porto Alegre.

The Randon Group has approached IFC with a request for financing of an investment program that will expand and modernize the production capacity of its operations. The project will be implemented during 2005-2009, and its cost is approximately $350 million. The project has the following components:

- the expansion and modernization of trailer and wagon manufacturing production capacity ($153 million);
- the expansion and technology upgrade of automotive component production facilities ($132 million); and
- working capital requirements for continuing growth (US$65 million). This investment program is part of the Randon Group’s long-term strategy to further consolidate its leading position in the domestic market and to strengthen its competitiveness in the global market.

IFC has been requested to provide loans of up to $35 million for two specific project items to be carried out by IFC’s existing borrowers as follows:

- up to $25 million to Randon S.A. Implementos e Participações (Randon) for the installation of an electrostatic and water-based painting line, which will replace the existing painting processes with state-of-the-art technology to reduce the air and water effluents, improve the product quality and achieve cost savings; and
- up to $10 million to Fras-le S.A. (Fras-le) for the expansion of brake pad manufacturing capacity to supply a new order from DaimlerChrysler.

Overview of IFC's Scope of Review

The project began with a 3 day site visit to both plants (Randon Implementos and Fras-le) in Caxias do Sul starting on December 12, 2006.

- Interview 1 – Fras-le – December 13, 2006:
From Fras-le: Marcelo Roberto S. Santos / Health and Safety Coordinator, Fabiane Mafessoni / Environmental Specialist, Tatiana Viegas/Human Resources

From IFC: Sérgio Finger / Environmental Consultant

- Interview 2 – Randon Implementos – December 14, 2006:

From Randon: Gerson Luiz Dupont / Environmental health and Safety Engineer, Luciane Sartori / Environmental Specialist
From IFC: Sérgio Finger / Environmental Consultant.
A Desk review was made with documents provided by both Randon Implementos and Fras-le, such as:
Randon:

- Environmental and Social questionnaire;
- Environmental Management System;
- Water supply;
- Ambient Noise;
- Workplace Noise;
- Air Emissions;
- Liquid Effluents;
- Solid Waste Management;
- Hazardous Waste Management;
- Public Disclosure and Social Development Programs;
- Occupational Heath and Safety;
- Fire and Life Safety;
- Accident Statistics;
- Emissions from boilers and Environmental permits;
- Emergency preparedness;
- Internal Communication Procedures;
- Performance Indexes.

Fras-Le:

- Environmental and Social questionnaire;
- Environmental Management System (ISO 14.000 procedures – Ifs);
- Gas Washing system;
- Water supply;
- Energy supply
- Air Emissions;
- Liquid Effluents;
- Solid Waste Management;
- Hazardous Waste Management;
- Public Disclosure and Social Development programs;
- Trainings;
- Occupational Heath and Safety;
- Fire and Life Safety;
- Emergency preparedness;
- Internal Communication Procedures;
- Performance Indexes.

E & S Project Categorization and Applicable Standard

Environmental and Social Mitigation Measures

Stakeholder Engagement