PROJECT

Projects

Environmental Review Summary

Project Number

24719

Company Name

RIO TINTO SIMFER SA

Date ERS Disclosed

Feb 23, 2006

Country

Guinea

Region

Africa

Date Revised ERS Disclosed

Jul 6, 2007

Environmental Category

B - Limited

Status

Completed

Previous Events

Approved : Apr 20, 2006
Signed : Jul 6, 2006
Invested : Aug 9, 2006

Sector

Iron (Pellets, etc.)

Industry

other

Department

Gbl Infrastructure & Natural Resources

Project Description

This ESRS has been revised in order to reflect a slight change in the wording relating to the process of categorization of any potential future investment in this project to ensure consistency with IFC procedures.

The project refers to the exploration, evaluation of high grade iron ore resources within a 110 km long Mining Concession that covers the Simandou mountain range in south eastern Guinea (the “Project”). The Mining Convention covering the Concession area is held by a locally incorporated Rio Tinto subsidiary, SIMFER S.A. The proposed IFC investment is the acquisition of a 5% stake in SIMFER S.A. and future contributions to equity cash calls until completion of a Feasibility Study for any of the exploration targets in the Simandou Range. In addition to the equity investment, IFC will have call options to acquire 5% stakes in potential iron ore resources in other Rio Tinto Iron Ore (“RTIO”) Exploration Licences in Guinea, applied for but not yet granted, namely Simandou North, Simandou South, Forecariah and Diéké (the “Additional License Areas”).

RTIO, a division of Rio Tinto plc., has undertaken extensive iron ore exploration work in Guinea since 1996. Most of the exploration activities were concentrated at the Pic de Fon area within a 7.5 km stretch of the 110 km long Simandou Range. The current exploration program includes 13 different targets spread out over approximately 740 km2, of which the southern zone, namely Pic de Fon and Oueleba are the most advanced. Within the Simandou Range, RTIO exploration activities are targeted at confirming sufficient high grade resources to support a 40-50 mtpa mining operation with a mine life of 50 years plus. If the exploration targets are confirmed, the infrastructure required to transport the iron ore to the coast will be significant and may include up to 650 kms of railroad and construction of a deep water port.

Environmental and Social

Conclusion & Monitoring

Environmental and Social Documentation

File Name Actions
Cover_English.pdf
Cover_French.pdf
Report_English.pdf
Report_French.pdf
Appendix_AJE.pdf
Appendix_AJF.pdf
AppendixD_E.pdf
AppendixD_F.pdf
Schedule_E.pdf
Schedule_F.pdf
Project_Components_E.pdf
Project_ComponentsF.pdf
Survey_Stations_E.pdf
Survey_Station_F.pdf
Perpspective_Canga_E.pdf
Perpspective_Canga_F.pdf
Landuse_Canga_East_E.pdf
Landuse_Canga_F.pdf
Airstrip_Zoom_E.pdf
Airstrip_Zoom_F.pdf
Access_Road_Options_E.pdf
Access_Road_Options_F.pdf
LandUse_Access_Road_E.pdf
LandUse_Access_Road_F.pdf
Base_Camp_ImpactsE.pdf
Base_Camp_ImpactsF.pdf
Airstrip_ImpactsE.pdf
Airstrip_ImpactsF.pdf
Cost_EstimationE.pdf
Cost_EstimationF.pdf