PROJECT

Projects

Environmental Review Summary

Project Number

11703

Company Name

KINGAMYAMBO MUSONOI TAILINGS (KMT) SARL

Date ERS Disclosed

Mar 21, 2005

Country

Congo, Democratic Republic of

Region

Africa

Date Revised ERS Disclosed

May 20, 2008

Environmental Category

B - Limited

Status

Completed

Previous Events

Approved : May 12, 2005
Signed : Nov 1, 2005
Invested : Mar 10, 2006

Sector

Copper

Industry

other

Department

Gbl Infrastructure & Natural Resources

Project Description

This ESRS has been revised in order to reflect a slight change in the wording related to the process of categorization of any potential future investment in this project to ensure consistency with IFC procedures.

Project update: Subsequent to the disclosure of this ERS in March 2005, First Quantum Minerals (FQM) took over as the principal shareholder of this project from Adastra Minerals Inc. The 18-month hiatus following the FQM take-over has involved a process review by the new owners of the project leading to design changes and improvements. The Environment & Social Impact Assessment (ESIA) documentation has been updated to reflect these design modifications and has incorporated IFC’s new Performance Standards and Environmental, Health & Safety Guidelines. Local disclosure of the updated ESIA documentation was undertaken during the first week of April, 2008, in Kolwezi and Lubumbashi, DRC. This amended Environmental Review Summary is being published for information purposes only, in the interests of transparency, in order to make the updated ESIA documentation available to non-local stakeholders at the earliest possible stage (i.e. as the main construction phase begins). IFC is currently in the process of evaluating providing financial support to the construction and operation of the Kolwezi Tailings Project. If and when IFC opts to provide financing, a comprehensive Environmental and Social Review Summary (ESRS) and Summary of Project Information (SPI) will be disclosed on the IFC disclosure portal, together with the same (attached) ESIA documentation, in accordance with IFC disclosure policies. Hard copies of the attached information may be viewed at:

First Quantum Minerals Lubumbashi Office
Villa Munua
Route Du Golf 1714 (near "Dundee" Guest House")
Lubumbashi, Katanga Province, DRC

First Quantum Minerals Kolwezi Office
Avenue Lumumba, 617
Kolwezi, Katanga Province, DRC

Sponsor contact details are as follows:

Andrew Spivey
Group Environmental Manager
First Quantum Minerals Limited
3805, Zambia Road
Box 230022
Ndola
Zambia

Tel. +260 212 651555/6
Fax. +260 212 651553
Cell. +260 966 784906
Email. Andrew.spivey@fqml.com

Please note that some of the figures are too large to disclose in electronic format but that these will be available in hard copy at the World Bank Infoshop and at the locations listed above. Note also that all information below this point, with the exception of the attached ESIA documentation, has not been modified from the original text disclosed in May 2005.

The project is to prepare a definitive feasibility study (DFS) including marketing, technical, and environmental and social impact studies, for the re-treatment of processed oxide tailings from the Kolwezi concentrator, located in Katanga province, which began operations in the early 1950’s. Owing to the poor recovery rates obtained at the time, valuable amounts of copper and cobalt were discharged in the form of tailings. The tailings reserve consists of 112.5 million tons grading 1.49% copper and 0.32% cobalt. Preliminary technical studies indicate that a leaching and solvent extraction plant costing about $300 million could produce 30,000 tons per annum (tpa) of copper and 5,500 tpa of cobalt, although technical, marketing, and financing factors, to be considered during the DFS, may dictate a staged development. The project company is Kingamyambo Musonoi Tailings SARL (KMT), a Congolese company which has been created for the purpose of exploiting the tailings. KMT is currently owned 82.5% by Congo Mineral Developments Limited (CMD), 12.5% by Gécamines, the state-owned mining company, and 5% by the government of DRC. CMD is a wholly owned subsidiary of Adastra Minerals Inc. (Adastra). Should IFC’s proposed investment be approved, it will acquire a stake of 10% in KMT from CMD. The Industrial Development Corporation of South Africa (IDC) also has an option to acquire 10% of KMT, which it has elected to exercise. The exercise of the IFC and IDC options would reduce CMD’s shareholding in KMT to 62.5%.

Environmental and Social

Conclusion & Monitoring

Environmental and Social Documentation

File Name Actions
exsummary Final.pdf
Chapter 1final.pdf
Chapter 2FInal.pdf
Chapter 3 Final.pdf
Chapter 4 Final.pdf
Chapter 5 final.pdf
Chapter 6 final.pdf
Chapter 7 Final.pdf
Chapter 8 Final. doc.pdf
Chapter 9 Final.pdf
ESMP Final.pdf
Annexure A final.pdf
Annex B Final.pdf
Annex C Final.pdf
Annex D Final.pdf
Annex E Final.pdf
Annex F Final.pdf
Annex G final.pdf
Annex H Final.pdf
Annex I Final.pdf
Fig 1.1.pdf
Fig 1.2 Location of the KMT Concession area-A3.pdf
Fig 1.3 Location of the KMT Concession area-A0.pdf
Fig 3.1 Location of the Kingamyambo and Musonoi tailings de.pdf
Fig 3.3 Schematic diagram of mining of the Kingamyambo Tail.pdf
Fig 3.4 process flow diagram-Layout1.pdf
Fig 3.5 plant layout-Layout1.pdf
Fig 3.6 Location of the alternative quarry sites investigat.pdf
Fig 3.7 Location of potential limestone quarry.-Layout1.pdf
Fig 3.8 General arrangement of the tailings dam-A3.pdf
Fig 3.9 Discharge Channels-Discharge channels and pipeline.pdf
Fig 3.14 Road & Rail links_Lubumbashi to Kolwezi.pdf
Fig 3.15 Possible transport routes to & From Kolwezi.pdf
Fig 3.16 General arrangement of the location of construction.pdf
Fig 4.1 Location of the plant sites investigated-A3.pdf
Fig 4.2 location of proposed wellfield.pdf
Fig 5.1 location of original and final KMT concession bounda.pdf
Fig 5.3 Simplified stratigraphical column-Layout1.pdf
Fig 5.5 Geology comprising the KMT concession area-Layout1.pdf
Fig 5.6 Geological cross section through the KMT concession .pdf
Fig 5.7 Soil mapping units in KMT concession area-Layout1.pdf
fig 5.8 Land capability distribution in KMT concession area-.pdf
Fig 5.9 Land use map-Land use.pdf
fig 5.10 Position of the rainfall stations-A3.pdf
Fig 5.15 Dust fallout monitoring points-dust monitoring.pdf
Fig 5.16_Average monthly dust.pdf
fig 5.17 Present conditions ave max 24 hr TSP concentrations.pdf
fig 5.18 Present conditions - average annual tsp concentrat.pdf
Fig 5.19 present conditions - average maximum 24 hour pm10 .pdf
Fig 5.20 Average annual PM10 concentrations.pdf
Fig 5.21 Position of the Musonoi river and it's tributaries-.pdf
Fig 5.22 1in 50 and 1in100 year floodlines of the Musonoi ri.pdf
Fig 5.23 Location of Ground and Surface water monitoring poi.pdf
Fig 5.27_Coceptual Hydrogeological model.pdf
Fig 5.28 conceptual hydrogeological model-section.pdf
fig 5.29 Piezometric surface for kolwezi region-Layout1.pdf
Fig 5.37 Noise measurement sites in relation to the proposed.pdf
Fig 5.38 contours of the present ambient noise levels during.pdf
fig 5.43 Vegetation map of the KMT concession area-Vegetatio.pdf
fig 5.44 Sites of biodiversity importance-sites of interest.pdf
Fig 5.46 Senstive ecosystems in the KMT concession area.pdf
Fig 6.1 Location of the KMT Concession area-A3.pdf
Fig 6.3 Archaeological and ethnological sites-archeology.pdf
Fig 7.1 operational conditions - average maximum 24 hour ts.pdf
Fig 7.2 operational conditions - average annual tsp concent.pdf
Fig 7.3 opp conditions - average maximum 24 hour pm10 conce.pdf
fig 7.4 operational conditions - average annual pm10 concen.pdf
Fig 7.5 operational conditions - average maximum 24 hour co.pdf
Fig 7.6 operational conditions - average annual tsp concent.pdf
Fig 7.7 conditions - average maximum 24 hour pm10 concentra.pdf
Fig 7.8 operational conditions - average annual pm10 conce.pdf
Fig 7.9 contours of the resulting absolute ambient noise le.pdf
fig 7.10 contours of the resulting absolute ambient noise l.pdf
Fig 7.11 contours of the increase in L aeq 1 hr for the noi.pdf
fig 7.12 contours of the resulting absolute ambient noise l.pdf
fig 7.13-Layout1.pdf
Fig 7.14 contours of the increase in L aeq 1 hr for the noi.pdf
fig 7.15-Layout1.pdf
Fig 7.17 Samukonga village-Layout1.pdf
Fig 7.18 Kipepa Village-Layout1.pdf
Fig 7.19_Traffic Volumes.pdf
Fig 9.1 General Arrangement for prosed projects kolwezi-Layout1.pdf
Fig 9.2 Boundaries of other mining concessions-Layout1.pdf
Fig 9.3 Expected cumulative impact of proposed mining activ.pdf