PROJECT

Projects

Environmental Review Summary

Project Number

11632

Company Name

AD HYDRO POWER LIMITED

Date ERS Disclosed

Jan 6, 2004

Country

India

Region

South Asia

Date Revised ERS Disclosed

Sep 28, 2004

Environmental Category

A - Significant

Status

Completed

Previous Events

Approved : Oct 12, 2004
Signed : Jan 25, 2005
Invested : Mar 13, 2007

Sector

Large Hydro - Renewable Energy Generation

Industry

other

Department

Gbl Infrastructure & Natural Resources

Project Description

The project is a 192 MW run-of-river hydropower project in the Kullu Valley of India’s Himachal Pradesh State. The project consists of a high-head power plant that utilizes flows from a combination of glacial snow melt and monsoon rains to supply peaking reservoirs via tunnels from the catchment basins of the Allain and Duhangan rivers. The project will divert a portion of the flow of the two rivers via a steel-lined pressure shaft tunnel to feed a single subterranean powerhouse equipped with two 96 MW Pelton turbines. The setting for the project is the steep terrain of the Himalayas with the diversion dams on the two rivers. Water is returned to the Allain River via a tailrace downstream from the powerhouse. Power is evacuated to the regional grid from an outdoor switchyard via a 185 km transmission line.

The project has been developed to meet the projected increase in the demand for electricity throughout northern India in the next decade, and it is consistent with the Government of India’s goal to double the existing percentage of electricity generated from renewable sources, especially hydropower. The ESIA documentation was prepared by Environmental Resource Management (ERM) Pvt. Ltd. over a period between January 2003 and September 2004. During that time, the consultants and representatives of the project Sponsor undertook extensive consultation with the project-affected population on a family and group basis. The chronology of the public disclosure process for the project is given on page
56 of the Addendum to the ESIA.

Environmental and Social

Availability of Full Documentation

Environmental and Social Documentation

File Name Actions
ESMMP.pdf
ESIA Chapter 1 - Part 1.pdf
ESIA Chapter 1 - Part 2.pdf
ESIA Chapter 1 - Part 3.pdf
ESIA Chapter 1 - Part 4.pdf
ESIA Chapter 2-3.pdf
ESIA Chapter 4 - Part 1.pdf
ESIA Chapter 4 - Part 2.pdf
ESIA Chapter 4 - Part 3.pdf
ESIA Chapter 4 - Part 4.pdf
ESIA Chapter 4 - Part 5.pdf
ESIA Chapter 4 - Part 6.pdf
ESIA Chapter 4 - Part 7.pdf
ESIA Chapter 4 - Part 8.pdf
ESIA Chapter 4 - Part 9.pdf
ESIA Chapter 5-9.pdf
ESIA Annex A - Part 1.pdf
ESIA Annex A - Part 2.pdf
ESIA Annex A - Part 3.pdf
ESIA Annex B - Part 1.pdf
ESIA Annex B - Part 2.pdf
ESIA Annex C.pdf
ESIA Annex D .pdf
ESIA Annex E - Part 1.pdf
ESIA Annex E - Part 2.pdf
ESIA Annex F.pdf
ESIA Annex G.pdf
ESIA Annex H - Part 1.pdf
ESIA Annex H - Part 2.pdf
ESIA Annex H - Part 3.pdf
ESIA Annex H - Part 4.pdf
Hindi ESIA Chapter 1-3.pdf
Hindi ESIA Chapter 4 - Part 1.pdf
Hindi ESIA Chapter 4 - Part 2.pdf
Hindi ESIA Chapter 4 - Part 3.pdf
Hindi ESIA Chapter 4 - Part 4.pdf
Hindi ESIA Chapter 5-6.pdf
Hindi ESIA Chapter 7-9a.pdf
Hindi ESIA Chapter 9b-10.pdf
Hindi ESIA Glossary.pdf
Hindi ESIA Table 10.1 (316-324).pdf
Hindi ESIA Table 10.1 (337-340).pdf
Hindi ESIA Table 10.1 (354).pdf
Hindi ESIA Annex A.pdf
Hindi ESIA Annex B - Part 1.pdf
Hindi ESIA Annex B - Part 2.pdf
Hindi ESIA Annex B - Part 3.pdf
Hindi ESIA Annex B - Part 4.pdf
Hindi ESIA Annex B - Part 5.pdf
Hindi ESIA Annex B - Part 6.pdf
Hindi ESIA Annex B - Part 7.pdf
Hindi ESIA Annex B - Part 8.pdf
Hindi ESIA Annex B - Part 9.pdf
Hindi ESIA Annex C - Part 1.pdf
Hindi ESIA Annex C - Part 2.pdf
Hindi ESIA Annex C - Part 3.pdf
Hindi ESIA Annex C - Part 4.pdf
Hindi ESIA Annex D - Part 1.pdf
Hindi ESIA Annex D - Part 2.pdf
Hindi ESIA Annex D - Part 3.pdf
Hindi ESIA Annex D - Part 4.pdf
Hindi ESIA Annex D - Part 5.pdf
Hindi ESIA Annex D - Part 6.pdf
Hindi ESIA Annex F.pdf
Hindi ESIA Annex G.pdf
Hindi ESIA Annex H - Part 1.pdf
Hindi ESIA Annex H - Part 2.pdf
Hindi ESIA Annex H - Part 3.pdf
Hindi ESIA Annex H - Part 4.pdf
Hindi ESIA Annex H - Part 5.pdf
Fisheries Study.pdf
Forestry & Watershed 1.pdf
Forestry & Watershed 2.pdf
Hydrology Study.pdf
PCDP.pdf
Reconn 1.pdf
Reconn 2.pdf
Reconn 3.pdf
Reconn 4.pdf
Reconn 5.pdf
SIA Chapter 1-2.pdf
SIA Chapter 3-6.pdf
SIA Chapter 7-8.pdf
SIA Chapter 9-12.pdf
Hindi Fisheries Study.pdf
Hindi Forestry & Watershed Table of Contents.pdf
Hindi Forestry & Watershed.pdf
Hindi Hydrology Study Table of Contents.pdf
Hindi Hydrology Study.pdf
Hindi PCDP Chart (41).pdf
Hindi PCDP Table of Contents.pdf
Hindi PCDP.pdf
Hindi Reconn Annex A - Part 1.pdf
Hindi Reconn Annex A - Part 2.pdf
Hindi Reconn Annex A - Part 3.pdf
Hindi Reconn Map - Part 1.pdf
Hindi Reconn Map - Part 2.pdf
Hindi Reconn Table of Contents.pdf
Hindi Reconn.pdf
Hindi SIA 1.pdf
Hindi SIA 2.pdf
Hindi SIA 3.pdf
Hindi SIA Annex A.pdf
Hindi SIA Chart (112).pdf
Hindi SIA Chart (113).pdf
Hindi SIA Chart (114).pdf
Hindi SIA Chart (76).pdf
Hindi SIA Chart (77).pdf
Hindi SIA Chart (78).pdf
Hindi SIA Chart (79).pdf
Hindi SIA Chart (94).pdf
Hindi SIA Chart (95).pdf
Hindi SIA Chart (RAP).pdf
Hindi ESMMP 1.pdf
Hindi ESMMP 2.pdf
Hindi ESMMP 3.pdf
Hindi ESMMP 4.pdf
Hindi ESMMP 5.pdf
Hindi ESMMP 6.pdf
Hindi ESMMP 7.pdf
Hindi ESMMP 8.pdf
Hindi NTES 1.pdf
Hindi NTES 2.pdf
Hindi NTES 3.pdf
Hindi NTES 4.pdf
NTES 1.pdf
NTES 2.pdf
ERM-Addendum-Report-Sep-04.pdf
Annex-I.pdf
Annex-II.pdf
Annex-III-Eng-Hindi.pdf
Annex-VI.pdf
Annex-VII.pdf
Annex-IX-A.pdf
Annex-IX-B.pdf
Annex-X-Pg-1to4.pdf
Annex-X-pg-5-7-note-on-Dam-height.PDF
Annex-XI.pdf
Annex-XII.pdf
Annex-XIII.pdf
Annex-XV.pdf
Annex-XVII.pdf
List of Annexes.pdf
Annex-IV.pdf
Annex I_Hindi Clause 5.24 of IA.pdf
Annex II_Government Notification.pdf
Annex III - Agreement between Prini & Company.pdf
Annex IV_Hindi_FAQ's.pdf
Annex IXA_Hindi LOA of FES.pdf
Annex IXB_Hindi LOA of WPA.pdf
Annex V_Layout Drawing.PDF
Annex VI-Affidavit on compensation of riparian rights.pdf
Annex VII_Duhangan Discharge.pdf
Annex VIII_Hindi Clause 5.11 & 5.16 of IA.pdf
Annex X_Hindi Note on height of water retaining structures.pdf
Annex XI_Hindi Grievance Redressal Cell Order.pdf
Annex XII_Hindi Independant Appeal Mechanism.pdf
Annex XIII_Land rate from land acquisition agreement .pdf
Annex XIV_Hindi Roorkee Work Order.pdf
Annex XV_NOC from Prini village.pdf
Annex XVI_NOC from Jagatsukh village.pdf
Annex XVII_Support letters from Jagatsukh village.pdf
Final Hindi ESIA Addendum - A.PDF
Final Hindi ESIA Addendum - B.PDF
Final Hindi ESIA Addendum - C.PDF
Final Hindi ESIA Addendum - D.PDF
Final Hindi ESIA Addendum - E.PDF
Final Hindi ESIA Addendum - F.PDF
Final Hindi ESIA Addendum - G.PDF
Final Hindi ESIA Addendum - H.PDF