43099
CENTRAL TERMICA DE TEMANE SA
Jan 30, 2020
Mozambique
Africa
Mar 7, 2022
Gas - Thermal Power Generation
Infrastructure
Regional Industry - INF Africa
Other
The proposed project consist of the construction and operation of a ~420MW natural gas power plant (Combined Cycle Gas Turbine) power plant which will draw gas from Sasol reservoirs via planned Sasol gas processing infrastructure, located in the vicinity of an existing Sasol Central Processing Facility (CPF). The preferred project location is ca. 500 m south of the CPF. The CPF, and the proposed project site is located in the Temane/ Mangugumete area, Inhambane Province, ca. 40 km northwest of the town of Vilanculos. The Govuro River lies 8 km east of the proposed CCGT site. The estimated footprint of the CCGT power plant is ca. 20 ha.
The Project involves the construction of a 25 km 400 kV electrical transmission line to connect the power plant to a new Vilanculos substation, which is being developed as part of the ~563 km 400 kV Temane Transmission Project (TTP) connecting Vilanculos to Maputo. Additional associated infrastructure and project facilities may include: a) gas pipeline from the CPF to the power plant and b) access road, construction camp and contractor laydown areas.